Application

The plant may be built on site, land-locked, or on a barge. Construction on a barge is preferably done at a shipyard, reducing the capital expenditure by 10% or more

 

Any plant size is possible. Large systems may be 275 MWth or multiples thereof

 

Because of compact size, retrofit/repowering is possible in a relatively small space

 

The plant may be built with CO2 capture, or as a capture ready system. The capture ready system will remove all contaminants, except CO2, to the same low levels as the capture installed version

 

The plant may operate as a power only or combined heat and power system. The latter can yield up to 90% overall efficiency including CO2 capture